menu
Mobile Logo
shopping_cart
3 Results
filter_altFilter
sort

Specialty Proppants

Specialty proppants and engineered systems from Baker Hughes are effective ways to sustain production. By opening and supporting fracture networks in new or existing wells, short-term and long-term production can dramatically increase.

NeutraProp

Part #NEUTRA
Lead time:8-12 weeks

Surface modified and brings proppant to neutral wet state that enable fluids to flow freely through the pore spaces in a proppant or gravel pack. The proppant surface is engineered to repel fluids thus accelerating flow and enabling low pressure wel ... Show More

Prices From $1,400.00
Prices From $1,400.00

FlexSand MSE

Flowback additives to control proppant flowback and reduce crushing effects of proppant, resulting in improved fracture conductivity and long-term stimulation performance. ... Show More

Price on request

Price on request

LiteProp and LiteProp Prime

Part #LITE
Lead time:8-12 weeks

Ultra Light Weight Proppant. Available in a broad range of specific gravities (1.06, 1.25 and 2.0) for application and sizes to up to 8,000 psi @ 275°F. Transport of LiteProp in fracturing fluid is efficient. Inherently slow settling rates (compare ... Show More

Prices From $1,720.00
Prices From $1,720.00